Skip to content. | Skip to navigation

Personal tools

Navigation

You are here: Home / Wiki / Kb210

Kb210

Emulab FAQ: Testbed Operations: How do I remotely power cycle Ops?

Emulab FAQ: Testbed Operations: How do I remotely power cycle Ops?

Couldn't get on on the console, hung in inode wait.

Fortunately, I plugged ops into a power controller so I found the right outlet to power cycle it. Will see shortly what shape the FS is in.

For the record (I haven't narrowed this down), doing:

power cycle ops foo1 foo2

should power cycle it. I think I may have its redundant PSes plugged into two outlets, hence the need to power cycle more than one thing. I tried "ops" alone, but it did nothing.

And, you can tip to ops from snake.flux.utah.edu.